Our first day of work involves working outside, I love California! |
First we measure a square, with many diagonal lines with the same value. |
Then Mike connects all the lines with a string, it works! |
We bring the boards to the site to figure out where they should go... |
Luckily the artist is there to guide us. |
End of day one! |
Mike drills holes in the custom made clips. |
Then he drills holes in the wall. |
And then he fastens the clips. |
This is where a board should fit perfectly. |
It does! End of day two! |
Our crate with the mosaics arrive! |
The first one we will install. |
Back-buttering the smalti. |
It is easier for us to install on the table than on the wall (especially since this is a very busy recreation center). |
Once we have let the mortar set a bit, it is safe to pick it up and set it in place. |
The second mosaic we installed today. |
I am using all my strength to hold it to the wall while Mike screws the clips onto the board (not realizing the clips alone hold it in place). |
End of day 3! |
The back of a spine. |
Mike is securing the mosaic to the wall (we are using this method so that if it is ever needed, the mosaics can be removed). |
The pieces on the edge are easy to accidentally knock out while mounting on the wall so some fixes are needed. |
Now that I know it won`t fall, I can leisurely secure it while Mike finds the drill. |
End of day 4! |